Rough-in basics
The rough-in is the distance from the finished wall to the center of the drain. The common figure is 12 inches, and 10 and 14 inch versions exist, so check your toilet's spec sheet before the plumber sets the drain.
The drain stub goes into the floor with a closet flange on top. A flange sits level with the finished floor, not below it, or the wax ring will not seal. Tile and flooring thickness must be planned before the flange is set.
| Detail | What to check | Why it matters |
|---|---|---|
| Rough-in distance | 12 inches is common, confirm the model | The tank must clear the wall |
| Flange height | Level with the finished floor | A proper seal |
| Drain and vent | Right slope and a vent to the roof or an approved device | Quiet flush, no siphoning |
| Supply stub | Shutoff valve at the wall, centered | Easy service later |
Have a plumbing problem now?
Call the 24/7 line and a plumber will talk it through.
Rough-in with the drain
The plumber places the drain, vent and supply during framing.
Pressure test and inspect
Where a permit applies, the inspector looks at the rough-in before walls close.
Finish floors
Tile or flooring goes in. Leave the flange access clear.
Set the toilet
Set a new wax or waxless seal, level the bowl, tighten the bolts gradually and connect the supply.
Venting and drain sizing in plain terms
Every drain needs a vent so air can enter behind the water and keep traps from siphoning. A toilet needs a drain of adequate size and a vent within a set distance of the trap, and the plumbing code defines both. The inspector checks them at rough-in.
If you are planning a bathroom in a basement or a spot below the sewer line, a sewage ejector may be needed to lift waste up. Your plumber decides during the plan, so it is not a surprise later.
Final set: what the plumber checks
After the flooring is down, the toilet is set on a new seal and the bolts are tightened gradually and evenly. The supply line is connected and the tank is filled. A flush test checks the water level, the seal and the flow.
The plumber also checks that the toilet does not rock and that caulk at the base leaves the back open or closed to your preference. A level bowl and a snug seal are the two things that make a new toilet trouble free for years.
Planning for accessibility and future use
If the home may need to serve older family members, plan clear floor space beside the toilet and consider solid blocking in the wall for grab bars. Blocking is cheap during framing and hard to add later. Tell your builder before drywall goes up.
Permits for new construction on the island
New plumbing in a new build goes through the City permit process. Most single-family plumbing permits can be applied for online at mybuildingpermit.com, and the Permit Counter at (206) 275-7605 can explain the process. Washington plumbing falls under WAC 51-56, the Uniform Plumbing Code (UPC) with state amendments.
The MyBuildingPermit chart says that replacing a toilet without line changes is not on the permit list, but a new bathroom in a new build is different because the drain, vent and supply are new. A tub or shower replacement is listed as requiring a permit.
Source type: City of Mercer Island permit pages, MyBuildingPermit and Washington State codeChoosing the toilet
Pick the toilet before the rough-in is final. Height, bowl shape and tank style change how it fits against the wall and the vanity. A comfort height toilet sits a couple of inches taller and is easier for many people to use.
Water-saving models work well when the drain slope and vent are right. A one-piece toilet is easy to clean and a two-piece is easier to carry. Our toilet installation page covers the final set.
Mistakes to avoid
- Setting the flange below the finished floor
- Forgetting to plan tile thickness
- Placing the supply stub off-center
- Skipping the vent or sizing it wrong
- Overtightening the bolts and cracking the base
Working with your builder
Tell your builder which toilets you chose, because rough-in varies by model. Ask for the plumbing plan and check it against the toilet spec sheet. For the whole bathroom, our plumbing installation page covers the rest of the work.
Toilet installation questions
Most toilets use 12 inches from the finished wall to the drain center. Check the spec sheet, because some use 10 or 14.
New plumbing in a new build needs a permit. A like-for-like replacement without line changes is not on the permit list. Ask the Permit Counter at (206) 275-7605.
The wax ring needs the flange at the finished floor to seal. A low flange can leak and a high one makes the toilet rock.
Yes. We also serve Medina and other nearby towns.