What a kitchen plumbing install includes
- Sink supply lines with shutoff valves
- A drain with a trap and a vent
- Dishwasher supply and drain with an air gap or high loop
- Garbage disposal mounting and wiring
- Pot filler or refrigerator water line
- Gas line for a range
- Under-sink filtration if you want it
| Fixture | Supply | Drain |
|---|---|---|
| Sink | Hot and cold | Trap and vent |
| Dishwasher | Hot supply | High loop or air gap |
| Disposal | None | Tied to the sink drain |
| Pot filler | Cold or hot | None |
| Gas range | Gas line | None |
Have a plumbing problem now?
Call the 24/7 line and a plumber will talk it through.
Planning the layout
Moving a sink is the most expensive change because it moves the drain and vent. Keeping the sink in the same wall saves money. If you do move it, plan the drain slope and vent early, before cabinets are ordered.
Decide on appliances before rough-in. A dishwasher, a disposal and a filter each need a specific connection, and the cabinet layout must leave room for them.
Plan with the builder
Share the plan so plumbing, electrical and cabinets agree.
Rough-in
Pipe goes in before walls close and is tested.
Inspection
Where a permit applies, the inspector checks the rough-in.
Finish
After counters and cabinets, we set the sink, faucet and appliances and test everything.
Choosing a sink and faucet
Single bowl, double bowl, farmhouse and undermount sinks each need a different drain layout. A deep bowl with a disposal needs extra clearance. A farmhouse sink needs a cabinet cut to match. Choose the sink before the countertop template is made.
For the faucet, check the number of holes in the sink and the supply line length. A pull-down faucet needs room for the hose. A pot filler needs a wall supply, which has to be roughed in before the backsplash.
Common mistakes in a kitchen plumbing plan
- Ordering cabinets before the sink and drain are fixed
- Forgetting the dishwasher loop or air gap
- Skipping shutoff valves under the sink
- Burying a connection with no access panel
- Starting work before the permit is in place
Coordinating with electricians and cabinet makers
A kitchen has many trades in a small room. The plumber needs the cabinet plan to place the supply and drain, and the electrician needs the disposal and dishwasher locations for power. Share one plan with all of them before work starts.
A short walkthrough with the plumber after the cabinets arrive catches conflicts early, such as a drain that lands in a drawer box or a shutoff that no one can reach.
Permits and kitchens on Mercer Island
The MyBuildingPermit chart, which covers Mercer Island, lists gas piping as permit work, and a gas range line falls under it. The same chart says replacing a sink without modifying lines is not on the permit list, though code still applies. A moved sink or a new dishwasher line changes the picture, so ask the Permit Counter at (206) 275-7605.
The kitchen drain leaves your house through the private side sewer to the City system. If you plan a heavy-use kitchen, the City's sewer system carries that grease on to its pump stations, so keep fats out of the line and consider hydro jetting if the line slows.
Kitchen sink, dishwasher and disposal connections follow the Uniform Plumbing Code (UPC) as amended in Washington.
Source type: MyBuildingPermit permits chart, City of Mercer Island permit and sewer pagesDisposals, dishwashers and filters
A disposal sits under the sink drain and needs its own power. A dishwasher drains through the disposal or the sink drain and needs a loop or an air gap so wastewater cannot flow back. Both are covered by our garbage disposal installation page.
An under-sink filter adds a small faucet or ties into the main tap. Plan the cabinet space before the countertop template is made.
Gas ranges and ventilation
A gas range needs a shutoff valve and a flexible connector sized for the appliance. A range hood moves combustion products and cooking fumes out of the house. If you are adding a gas range, review the plan with a licensed plumber and the hood supplier.
If you smell gas, leave and call Puget Sound Energy at 1-888-225-5773 or 911.
Budget and schedule tips
- Choose fixtures and appliances before rough-in
- Confirm rough-in dimensions with each product sheet
- Plan for permit and inspection time in the schedule
- Keep an access panel for shutoffs and traps
- Ask for a clear price for plumbing before work starts
Kitchen plumbing questions
Replacing a sink without changing lines is not on the MyBuildingPermit permit list, but moving it or adding a line changes that. Ask the Permit Counter at (206) 275-7605.
It depends on the distance and the access. The drain slope and vent drive the cost, and we give a clear price before work starts.
Yes, with a permit where required and a pressure test. Gas piping is on the MyBuildingPermit permit list.
Yes. We serve Medina and the island and follow each city's permit process.
